Osawa Memorial Institute of Architectural Environmental Engineering, Kanto Gakuin University
大沢記念建築設備工学研究所
About this Institute
Osawa Memorial Institute of Architectural Environmental Engineering was established in 1968 as an affiliated institute of Kanto Gakuin University at Professor Ichiro Osawa's proposal to conduct basic and applied research in urban and architectural environmental engineering, building equipment engineering, and related fields.
In 2005, the building was revitalized and renovated as a frontier of environmentally symbiotic technology, a comprehensive sustainable architecture, as part of an academic frontier promotion project by the Ministry of Education, Culture, Sports, Science and Technology of Japan.
Director's Greeting
To access the director's greeting page, please use the link button below.
本研究所は、都市・建築の環境工学、建築設備工学及びその他これらに関連する分野の基礎的、応用的調査・研究を行うことを目的にし、1968年、大澤一郎の提唱によって関東学院大学が附置する研究所として創設されました。
2005年、文部科学省学術フロンティア推進事業としてリニューアル工事を行い、総合的なサスティナブル建築=環境共生技術フロンティアとして再生・改修されたことにより、建物全体は、総合的研究施設であると共に、一つの大きな環境共生技術のための実験装置となっています。
Main Researchers
主要研究分野
Building Economics, Building Production
Architectural Environmental Engineering
Architectural Air Environment
Architectural Electrical Installations
Architectural Air Environment,
Air Conditioning/Ventilation System
Acoustic Environments with Human Speech Sounds
Researcher | MOTOZAWA Aya |
---|---|
Keywords | Indoor room, Acoustics, Human voice production & perception |
Plumbing Engineering,
Architectural Water Environmental Engineering
Architectural Heat Environmental,
Thermal Environmental
Institute Facility Overview
研究所概要
Facility Name | the Osawa Memorial Institute of Architectural Environmental Engineering | |
---|---|---|
Structure | RC (partly steel), four floors above ground | |
Purpose | Architectural environmental symbiosis technology and equipment research facility | |
RF | Rooftop, biotope, greening facility | |
4F | Living space experiment studio1, living space experiment studio2 | |
3F | Machine space, equipment engineering laboratory, meeting room, Director’s office | |
2F | Electrical equipment laboratory, measurement room 2, measurement room 3 | |
1F | Environmental symbiosis experiment workshop, toilet | |
Area | Site area: 126,208.27㎡ Total area: 733.42㎡ (including 177.55㎡ of extension) Building area: 308.75㎡ | |
Construction period | Start of construction: October 1, 2004, Completion: March 29, 2005 |